Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities
Importancia y uso:
4.1 The requirements of this guide apply to personnel who perform coating and lining work inspection during (1) fabrication, (2) receipt of items at the construction site, (3) construction, (4) pre-operational and startup testing, and (5) operational phases of nuclear facilities.
4.2 It is the responsibility of each organization participating in the project to ensure that only those personnel within their respective organizations who meet the requirements of this guide are permitted to perform coating and lining work inspection activities covered by this guide.
4.3 The organization(s) responsible for establishing the applicable requirements for activities covered by this guide shall be identified, and the scope of their responsibility shall be documented. Delegation of this responsibility to other qualified organizations is permitted and shall be documented.
4.4 It is the responsibility of the organization performing these activities to specify the detailed methods and procedures for meeting the requirements of this guide, unless those methods and procedures are otherwise specified in the contract documents.
4.5 In the event of conflict, users of this guide must recognize that the licensee’s plant-specific quality assurance program and licensing commitments shall prevail with respect to the process of qualifying personnel performing inspection of coating and lining work.
Subcomité:
D33.04
Referida por:
D7108-12R18, D7167-25, D3843-16R21E01, D4538-21, D5498-25, D4286-08R21, D6237-24, D3276-21, D5144-08R21
Volúmen:
06.02
Número ICS:
87.020 (Paint coating processes)
Palabras clave:
coating and lining work inspection; individuals certified to perform Level I, II, and III inspection;
$ 1,194
Norma
D4537
Versión
25
Estatus
Active
Clasificación
Guide
Fecha aprobación
2025-06-15
