Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)


Importancia y uso:

4.1 This practice is for use by designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of conduits through the use of a resin-impregnated fabric tube pulled-in-place through an existing conduit and secondarily inflated through the inversion of a calibration hose.

Subcomité:

F17.67

Referida por:

F3240-19R23, D5813-04R25

Volúmen:

08.04

Número ICS:

23.040.20 (Plastic pipes)

Palabras clave:

cured-in-place pipe; installation—underground; plastic pipe—thermoset; rehabilitation; thermosetting resin pipe ;

$ 1,229

Agregar al carrito

Norma
F1743

Versión
25

Estatus
Active

Clasificación
Practice

Fecha aprobación
2025-05-01