Standard Guide for Nuclear Facility Decommissioning Plans
Importancia y uso:
4.1 The standardization of decommissioning plans will provide the nuclear facility owner with a greater assurance that all basic planning elements and requirements have been identified, examined, and addressed.
4.2 In applying the guidance contained in this standard, the nuclear facility owner will address the significant subject areas necessary to describe a comprehensive decommissioning plan. Additional guidance on the planning of decommissioning projects, and the preparation of decommissioning plans can be found in such references as NUREG-1757 on decommissioning standard review plans, and Regulatory Guide 1.179 on the format and content of license termination plans. Recent new guidance on all aspects of decommissioning is contained in an ASME publication titled The Decommissioning Handbook.6
4.3 This decommissioning plan will be developed to serve as the executive document that describes the objectives of the decommissioning program and identifies and defines the elements necessary to accomplish the program.
4.4 A detailed implementation plan describing how the objectives of the decommissioning plan will be met should be prepared. Some of the documents or implementation plans that may be required to support the overall decommissioning program include an engineering plan; a cost, schedule, and financing plan (10 CFR 140 and 170); a field implementation plan; a health and safety plan (29 CFR 1910.120, Guide E1167); a quality assurance plan (10 CFR 50.59 and 10 CFR 830.120); an emergency plan; an environmental monitoring plan (Guide E1819); a radiological protection plan (10 CFR 20, 10 CFR 835, Guide E1167); and a physical security plan (10 CFR 73). These implementation plans shall be separate from and consistent with the decommissioning plan.
Subcomité:
E10.03
Referida por:
E1760-16R24, E1892-15R21, E1819-15R21
Volúmen:
12.02
Número ICS:
27.120.20 (Nuclear power plants. Safety)
Palabras clave:
decommissioning; decommissioning plans; decommissioning project planning ;